New crane leaving the shop
Verve Energy Project - 90T Major Inspections
Verve Energy Project Pic 3
Worn and loose runway rails
Verve Energy Project Pic 4
Verve Energy Project Pic 2
Outdoors Semi Portal Crane
Gearbox internals 2
Severe shock load damage 2
Crack in 10T hook found during Major Inspection NDT. Not visible to the naked eye.
Note the bent end carriage. Caused by overloading or shock loading.
Gearbox internals
New Panel Build
Painted and ready for re-assembly
Components ready for NDT (Non destructive testing).
Crack in hook discovered during NDT
Where there is a will, there is a way.
Some cranes have gremlins, some have SNAKES!
Mushroomed Rails
Crack in drive coupling found during Major Inspection.
Install of new 5T crane at Waitsia Gas Plant Dongara
Festoon cable and trolley damage
Severe Shock Load Damage
Crack in gear teeth - Only detected via NDT during a Major Inspection - Not visible with the naked eye.
The centre of attention. Crane Safety Projector Light
Very tidy installation for the Crane Safety Projectors
BEWARE - 40T winch drum with most of the drive end bolts missing (since OEM manufacture). Discovered during 10 Year Major inspection. Frightening discovery